HOME | JOBS | FEEDBACK | CONTACT US | LOG IN
Subscribe:  Mail Alerts Get Job Alerts


Apply for UNV Pakistan
Apply for Internship
Apply for YPO


Project Manager for Waste/Debris Management (DEX-SC)

Job Category:
Project Managers
Career Level:
Job Type:
Full Time
Positions:
1
Agency / Project:
Environmental Recovery Program for the Earthquake Affected Areas
City/Location:
Muzafarabad with frequent travel to earthquake affected areas of NWFP & AJK
Country:
Pakistan
Posted On:
30 May, 2007
Last Date to apply:
12 June, 2007
Experience in years
2 to 4
Experience:

At least 10 years in the construction/waste management field.

Familiar with procedures for the preparation of land sites for primary and secondary debris stacking and management.

Experience in handling of earth moving and construction machineries.

Experience in the preparation of environmental management plans for reconstruction activities, will be preferable.

Familiar with data collection methods, tools and monitoring plans

Command on computer/IT skills and strong understanding of GIS and digital imagery and its interpretation

Excellent interpersonal skills, team oriented work style

Self-motivated, ability to work with minimum supervision

Excellent ability to quickly grasp and synthesize inputs

Excellent communication skills in English is must and working knowledge of local languages will be an advantage.

Description:
 

1. Background

On 8 October 2005 an earthquake measuring 7.6 devastated the northern regions of Pakistan killing thousands of people and destroying public and private infrastructures and bringing economic activity to a virtual stop.  The area affected measures about 30,000 sq km2 and is home to about 3.5 million people. According to national figures, 500,000 families have been affected that is, approximately 14% of the region’s population, 70% of houses were destroyed and 30% damaged.  The earthquake resulted in loss of about 73,000 souls with some 70,000 injured. It has been touted as the worst natural disaster that has ever impacted Pakistan in its history.

About 72,000 acres of forest have been damaged in NWFP and 372,259 acres in AJK respectively. These severe damages have resulted in contributing to massive landslides during the monsoon season and during aftershocks. Large scale reconstruction will impose another threat to the environment without proper management. The implementation of the Environmental Strategy by all stake holders is key a responsibility. This task requires both hardware and software components to address the following interventions:
 
Immediate interventions (environmental assessment and safe disposal of waste generated due to relief activity)
Short Term interventions (solid waste management and debris removal)
Medium Term Interventions (mainstreaming environment safeguards in all reconstruction activities)
Long Term Interventions (NRM, slope stabilization, reforestation and improved watersheds)

The “Environmental Recovery Programme for the Earthquake Affected Areas” aims at managing the waste generated due to the earthquake and subsequent relief activities, and creating awareness about waste management and recycling of waste/debris for its use in the reconstruction of houses and other infrastructure. The Program also aims to mitigate landslip risks through integrated forestry, natural resource management and livelihood support activities. The Programme has jointly been developed by the UNDP and UNEP, in close consultation with Ministry of Environment and ERRA. UNEP will provide technical advisory role/support during programme implementation. UNEP has delivered a round of workshops on waste management, and the Programme will built upon its further activities on the assessments and ground work already completed by UNEP.


2. Duties and Responsibilities

Under the direct supervision of NPC (LS/NRM/Livelihood), the Project Manager for Waste/Debris Management will be responsible to:

Prepare project implementation plan, identify waste management priorities, and undertake project activities in close collaboration with the counterparts, local authorities and line departments in the earthquake affected areas;

Develop a framework for creation of sustainable waste management livelihoods to be implemented by international or local NGOs;

Arrange workshops on waste management for different stakeholders to share framework documents and guidelines for use by the government, multilateral and bilateral agencies and NGOs;

Plan debris assessments in the earthquake affected districts in AJK and NWFP for debris/waste management, and arrange for installation of crushing plants through private sector at various locations for recycling and reuse of debris;

Provide advice on the development of disaster waste handling procedures and operational arrangements for disaster waste re-use/re-cycling and disposal;

Extend technical assistance to the counterparts, local governments and other  institutions at the district level in the restoration and development of local government waste management systems, design and construction of interim and permanent landfills for debris removal, and improving the disposal of municipal & earthquake generated waste;

Ensure coordination and information sharing with other national and international humanitarian and development actors undertaking waste management activities;

Provide regular updates on progress implementation and prepare monthly and other periodic progress reports of the project.

Qualified females are particularly encourage to apply.


Education
Must Degree Degree Level Country Description
YesBachelorsBachelors Degree (4 Years)• B.E, preferably Masters in Civil Engineering, Structural Engineering, Construction Engineering or Environmental Engineering